Floor Conversion System for Swimming Pools
Distributors :
Forefront floor conversion system for swimming pools
Our floor conversion system for swimming pools can freely convert an official competition swimming pool into an arena and ice skating rink by moving the floor vertically with a hydraulic cylinder. This breakthrough system expands the range of swimming pool uses and offers more opportunities for all generations to enjoy.
Examples of other uses for a swimming pool
In addition to adjusting the water depth, the multipurpose pool system can lift the floor to the uppermost level to convert the pool into an arena.
Variable water depths of the conversion floor pool
Slide horizontally to see the table.
|
|
|
---|---|---|
Combination of a retractable roof and floor conversion system for swimming pools
Winter (roof: closed)
Converted into an ice skating rink
Summer (roof: open)
Changed back to a swimming pool
Effect in bringing in more customers
Results of the Amagasaki Forest Central Green Space Sports Health Promotion Facilities (April 2017 - March 2018)
The Amagasaki Sports Forest attracted more visitors by converting the swimming pool into an ice skating rink in winter.
Standard specifications
Slide horizontally to see the table.
Item | 50m × 25m swimming pool | 25m × 15m swimming pool | |
---|---|---|---|
Conversion floor | Main swimming pool | Floor surface: FRP made (for public pools) Molded cement plate panel (arena specification) Constitution material: SUS304 |
|
Number of conversion floors | 12.5m×25m×4 blocks | 12.5m×15m×2 blocks | |
Loading capacity | 60Kg/m2(for public pools) 360Kg/2(arena specification) |
||
Hydraulic cylinder | Thrust of cylinder | Approx.. 13 tons/cylinder | |
Number of cylinders | 16 pieces/4 blocks | 8 pieces /2 blocks | |
Stroke | For public swimming and leisure: 1.0 m For competition swimming and water polo: 2.0 m For synchronized swimming: 3.0 m |
||
Material of cylinder | SUS304 | ||
Elevating speed | Steady state: approx. 0.2 m/minute | ||
Hydraulic unit | Number of units | 1 unit | |
Driving force | AC3φ200V 60Hz Electric motor × 1 unit |
Example of Delivery
Slide horizontally to see the table.
No. | Name | Location | Owner | Designing supervisor | Delivery year & month | Specification |
---|---|---|---|---|---|---|
1 | Sapporo City, Hiragishi Swimming Pool | Sapporo, Hokkaido Pref. | Sapporo Health & Sports Foundation | Nikken Sekkei Ltd | Jul, 1989 | 50m Swimming pool: 9 courses, 25m Swimming pool: 6 courses |
2 | Taito-ward, Kiyoshima Pool | Taito-ward, Tokyo | Taito-ward | Shozo Uchii Architects | Mar, 1991 | 25m Swimming pool: 7 courses |
3 | Sugamo Sports Center | Toshima-ward, Tokyo | Mitsubishi Yowakai Foundation | Mitsubishi Heavy Industries, Ltd. | Feb, 1994 | Movable wall for 25m Swimming pool |
4 | Fukuoka-City, Sougou Nishi-kumin Pool | Fukuoka, Fukuoka Pref. | Fukuoka City | Nanotsu-Kotobuki | Mar, 1995 | 50m Swimming pool: 9 courses, Movable wall for 25m swimming pool |
5 | Fukuyama-City, Midoricho Park Indoor Stadium (Rose Arena) | Fukuyama, Hiroshima Pref. | Fukuyama City | Yasui Architects & Engineers, Inc. | Apr, 1995 | 50m Swimming pool: 9 courses, Floor conversion system for swimming pool and arena |
6 | Miyagi Prefectural General Sports Park, Swimming Pool | Miyagi-gun, Miyagi Pref. | Miyagi Pref. | Nissoken Architects / Engineers | Apr, 1995 | 50m Swimming pool: 9 courses |
7 | Osaka Prefectural Kadoma Sports Center | Kadoma, Osaka Pref. | Osaka Pref. | Showa Sekkei, Inc. | Mar, 1996 | Floor conversion system for 50m swimming pool, diving pool, and ice skating arena |
8 | Osaka Pool, Yahataya Park | Minato-ward, Osaka | Osaka City | Tohata Architects & Engineering Inc. | Mar, 1996 | Floor conversion system for 50m swimming pool, diving pool, and ice skating arena |
9 | Tenjin ike Onsui Pool | Nishiwaki, Hyogo Pref. | Nishiwaki City | Yoshida/Muto Architecture Institute | Mar, 1996 | 25m Swimming pool: 7 courses, Floor conversion system (Half side) |
10 | Obihironomori Shimin Pool | Obihiro, Hokkaido Pref. | Obihiro City | Nikken Sekkei Ltd | Jul, 1996 | 50m Swimming pool: 8 courses, Buoyancy type conversion floor (1/5section) |
11 | Yokohama International Swimming Pool | Yokohama, Kanagawa Pref. | Yokohama City | Souzou-sha | Apr, 1998 | 50m Swimming pool for arena, Movable wall for 25m swimming pool |
12 | Morioka, Municipal Swimming Pools | Morioka, Iwate Pref. | Morioka City | Kusuyama Architect Inc. | May, 1999 | 50m Swimming pool for arena : 8 courses |
13 | Nishikyogoku Sports Park Swimming Pool (Aquarena) | Ukyo-ward, Kyoto Pref. | Kyoto City | Environmental Design Institute, Norihiko Dan Joint Venture | Jun, 2002 | 50m Swimming pool: 10 courses, Floor conversion system for ice skating arena |
14 | Bunkyo Ward Hongo Elementary School Rooftop Pool | Bunkyo-ward, Tokyo | Bunkyo-ward | Raymond Architectural Design Office | Dec, 2001 | 25m 5courses FRP pool + Wire reel floor conversion system for arena |
15 | Mihama-cho Multi-purpose School pool | Mihama-cho, Fukui Pref. | Mihama-cho | Yamaguchi Design Office | Mar, 2002 | 25m: 6 courses, Wire reel type floor conversion system for arena |
16 | Notre Dame Elementary School Pool | Kyoto, Kyoto Pref. | Notre Dame Elementary School | Mitsubishi Heavy Industries, Ltd. | Mar, 2004 | 25m: 9 courses, Wire reel type floor conversion system for arena |
17 | Hyogo Prefectural Amagasaki Forest central green space Sports Health Promotion Facilities |
Amagasaki, Hyogo Pref. | Hyogo Pref. | Environmental Design Institute | May, 2006 | 50m Swimming pool: 10 courses, Floor conversion system for ice skating arena, 25m Swimming pool: 14 courses |